A wet week hits.
Right-click, and it’s handled.
In Sydney the binding constraint is often trade availability, and a wet east-coast spell on top of it. When a date moves, you right-click the task and reschedule, and the whole dependent chain moves with it. The affected vendor gets the new date as a two-way text conversation, so you hold your slot, the delay is recorded automatically as a wet day, and Oryn prepares the Extension of Time ready to send to your client for signature. Oryn does the work, you act at speed. This is not a normal Gantt chart.
The Founding Builders Programme · Onboarding in small cohorts
01 / What it does
What this feature does
This is the scheduling module of VIABUILD, the Construction Operating System for residential builders, set out for how a Sydney build actually sequences. It is task-based with real dependencies, the connected core of residential construction scheduling. Lock a baseline when the plan is agreed and you can always see how far the job has drifted.
In practice a Sydney program is often paced by how far ahead you can book trades and materials, with wet east-coast spells moving the exposed work on top of that. When a date moves you do not want to redraw a chart by hand and start ringing around. You want to right-click the affected task, reschedule, and have the whole chain move, the vendor told by text so you keep them, the wet day logged and the Extension of Time drafted, in one move.
02 / Why it matters
Why builders need it
Trade lead times are the constraint
In a busy Sydney market the schedule is paced by subbie availability. Right-click, reschedule, and the dependent chain moves with it so you can see the real cost of a slip at a glance.
The vendor hears by text, so you keep them
The affected subbie gets the new date as a two-way text conversation, not a notification buried in an app they never open. They reply straight back, so you re-book before you lose the slot.
Every wet day is captured
A wet east-coast spell is recorded automatically as a wet day, so the record that supports an Extension of Time is built as it happens, not reconstructed from memory months later.
The EOT is ready before you ask
Oryn prepares the Extension of Time from the wet day and the moved dates, ready for you to send to the client for signature. You act at speed.
Lose a slot, lose weeks
Miss a booked week and the next opening can be a fortnight out. Real dependencies show the true cost of a slip so you can protect the critical trades.
Milestones drive cash
Stage milestones line up with progress claims automatically. Keep the schedule current through a re-book and the claims still follow the build, with no re-entry.
03 / The VIABUILD way
How VIABUILD handles it
Right-click, reschedule, and Oryn does the rest.
Build the schedule as tasks with real dependencies, set milestones for the stages that matter, including the ones that trigger a claim, and lock a baseline when the plan is agreed.
Then run the job. When a wet spell or a booking clash moves a date, right-click the task and reschedule. The dependent chain moves with it and you see the new finish immediately against the baseline. The assigned vendor gets the new date as a two-way text message conversation and replies straight back, so you re-book before you lose them, with no portal to log into and no in-app notification they will never see. A weather delay is recorded automatically as a wet day.
From that wet day and the moved dates, Oryn prepares the Extension of Time, ready for you to send to the client for signature. Marking a stage done is still a completion, not a sign-off, the distinction between approvals and completions that keeps the program honest. On site the same dates show up in ViaSite, and because NSW builders carry Home Building Compensation obligations, a schedule that stays current makes those handover dates easier to hold.
- Right-click reschedule, the whole dependent chain moves
- Vendor notified by two-way text, so you hold your slot
- A weather delay recorded automatically as a wet day
- Oryn prepares the Extension of Time for client signature
- Baseline tracking to measure drift against the plan
- The same dates flow through to progress claims and the field
- Not a normal Gantt chart
04 / The workflow
How it runs, step by step
- 01
Build the sequence
Lay out tasks and dependencies the way a Sydney build runs, booking critical trades early.
- 02
Lock a baseline
Capture the agreed plan so you can measure drift against it later.
- 03
Right-click to reschedule
When a wet spell or a clash moves a date, reschedule and the whole dependent chain moves with it.
- 04
The vendor is told
The affected subbie gets the new date as a two-way text conversation and replies from site, so you keep the slot. No portal, no in-app notification.
- 05
The wet day is logged
A weather delay is recorded automatically as a wet day, building the record behind any Extension of Time.
- 06
Oryn prepares the EOT
The Extension of Time is drafted from the wet day and the moved dates, ready to send to the client for signature.
- 07
See the drift
Compare current vs baseline to know exactly how far you have moved, and act early.
05 / FAQ
Common questions.
You right-click the affected task and reschedule. The whole dependent chain moves with it, the assigned vendor gets the new date as a two-way text conversation so you can hold the slot, a weather delay is recorded automatically as a wet day, and Oryn prepares the Extension of Time ready for you to send to the client for signature. One move, not an afternoon of admin.
By a two-way text message conversation. The vendor gets the new date as a text and replies straight back to the task, so the conversation lives next to the work and you can re-book before you lose them. There is no portal to log into, no app to install and no in-app notification they will never open.
Yes. When a weather delay is logged as a wet day, Oryn prepares the Extension of Time from that record and the moved dates, ready for you to send to the client for signature. The supporting record is built as the delay happens rather than reconstructed later. See the guide on extensions of time and delays for the wider process.
Yes. Stage milestones in the schedule line up with stage-based progress claims, so as the build hits each stage your claims follow the work with no double entry, even when a re-book or a wet spell has moved the program.