Tools
Calculators that run on
your numbers, not ours.
Seven working calculators for the arithmetic that decides whether a residential job makes money. Each one takes your own rates, percentages and contract terms, because a figure you did not supply is a figure someone invented. Nothing is gated, nothing is downloaded, and every tool links to the reference that explains the concept behind it.
01 / The tools
Every calculator
Small, exact and useful on a live job. More are added when they earn their place rather than to fill a grid.
02 / How these are built
Three rules behind every tool here
Most construction calculators on the internet are lead capture with a text box attached. They pre-fill a rate nobody can source, produce a number that looks authoritative, and ask for an email address before showing it. These are built the other way around.
- Your figures, never ours. Every rate, percentage, cap and margin is entered by you. The build cost calculator in particular ships no dollars per square metre, because the honest rate for your next job is the one your last job produced, not a national average with a decade of scatter in it.
- The tool computes, the reference explains. Each calculator sits beside a knowledge node that covers the concept properly. The tool does the arithmetic and stops. If you want to understand why retention exists or how margin behaves across a whole business, the knowledge library is where that lives.
- The maths is exact and the caveats are stated. Nothing here is estimated by a model. Where a number depends on your contract or your tax position, the page says so rather than presenting an answer that only holds in one state or one accounting setup. All of it is general information, and the contract and your accountant remain the authority on your own job.
Between them the four cover the money trail a residential builder actually walks. You price the job with a margin, you claim it in stages, retention is withheld along the way, and the whole thing starts from a rate you should be able to defend. The resources library covers the checklist side of the same work.
One tool sits a step back from the job. The open job value calculator adds up the contract value of every job you have open and sets it against the limit on your home warranty certificate, so you can see how much more work fits before you tender for it.
The same arithmetic, running on the live job.
A calculator is a snapshot you retype every time. VIABUILD holds the rates, the claim schedule and the retention terms once, then keeps budget, committed cost, claims and forecast margin current as the job moves.