Feature · ViaSite

The site app supervisors
will actually use.

ViaSite is the field module of VIABUILD, the Construction Operating System for residential builders. Daily diaries, photo logs, defects and safety checklists, fast to use on a phone, synced live across the operating system. Included in every plan.

7 days free · then $555/mo · Month-to-month

01 / What it does

What this feature does

ViaSite is the field module of VIABUILD, the Construction Operating System for residential builders. It’s built for supervisors and leading hands, not for accountants in the office, so it’s quick to open, quick to log, and doesn’t get in the way of the day. Daily diaries, photos, defects and safety checklists all live here, and because it runs on one data model, everything syncs live across the rest of the operating system.

That means what happens on site shows up in the office without a phone call or an end-of-week catch-up. The diary, the photos and the defects are already there, entered once and shared everywhere, and the day’s progress lines up against the construction schedule so the office is seeing real progress from the field, not approvals mistaken for completions.

02 / Why it matters

Why builders need it

Office apps fail on site

Software designed for a desk is painful on a phone in the weather. ViaSite is built for the field first, as one module of the operating system.

The diary never gets written

A daily diary that’s slow to fill in just doesn’t get filled in. ViaSite keeps the entry short, typed on the phone with the photos already attached, so the record actually exists.

Photos go missing

Job photos scattered across personal phones are gone when you need them. Logged to the job, they’re always findable.

Defects slip through

A defect noticed and not recorded is a defect that comes back at handover. Capture it on the spot.

Small site jobs eat the day

Chasing a skip swap or a delivery means a phone call and digging up a number. 1-Click Quick Tasks do the common ones in a tap, including reordering the bin from the contracted supplier for that site.

Safety belongs on site

Safety checklists are done where the work is. Having them in the same app keeps them part of the routine.

03 / The VIABUILD way

How VIABUILD handles it

Fast field capture, synced live.

Supervisors open ViaSite on their phone and log the day as it happens: the diary entry, progress photos, any defects, the safety checks. It’s designed to be fast: a few taps, not a form built for a desktop.

Everything syncs live across the operating system, so the office sees site activity as it’s recorded. Diaries, photo logs and defects all attach to the right job, building a record you can rely on at handover or if anything is ever questioned. Because the diary is dated against the residential construction schedule, a slow day on site is visible early rather than at the next claim. ViaSite is one module of the operating system, included in every plan.

Logging is built to be quick, and it is worth being precise about how. The diary entry is typed, short by design, with the type tag, the photos and the visibility setting all a tap each. There is no dictation and no voice capture. Out of signal, the entry queues on the phone and sends when it reconnects, so a black spot never costs you the record. Weather is not pulled from a weather service anywhere in VIABUILD. It is marked on the daily log entry by the person who was there, who taps the morning and afternoon conditions and types the day’s high and low, which is why the record reflects what the site actually experienced rather than a regional observation.

1-Click Quick Tasks handle the routine site jobs in a single tap. You set each one up once in the office, naming the supplier it goes to and the message it sends. The flagship is the Skip Bin Re-order: a supervisor taps it, and the contracted bin supplier for that site receives an order with the job, the site address, the date and any note already filled in, with no phone call and no number to look up. Every run is logged against the job. To be straight about the boundary, it sends the order to the supplier; it does not raise a purchase order and it does not confirm the delivery back to you.

  • Built for supervisors on site
  • Typed diary entries, short by design, that queue offline
  • Photo logs attached to the job
  • Defect capture on the spot
  • Safety checklists in the field
  • 1-Click Quick Tasks you configure once (incl. Skip Bin re-order)
  • One module of the operating system · live sync, zero double entry · included in every plan

04 / The workflow

How it runs, step by step

  1. 01

    Open ViaSite on site

    Supervisors use the app on their phone, built for the field.

  2. 02

    Log the diary

    Type the day’s entry, tag what kind of day it was, and set who can see it. Offline, it queues and sends when the phone reconnects.

  3. 03

    Capture photos

    Progress and issue photos logged straight to the job.

  4. 04

    Note defects

    Spot a defect, record it on the spot before it’s forgotten.

  5. 05

    Run safety checks

    Complete safety checklists in the same app, in the field.

  6. 06

    Fire a Quick Task

    Tap a 1-Click Quick Task for routine jobs. Skip Bin Re-order sends the contracted supplier for that site an order with the job and address already in it.

  7. 07

    Office sees it live

    Everything syncs across the operating system as it’s recorded, with no weekly catch-up and no double entry.

05 / FAQ

Common questions.

ViaSite is the field module of VIABUILD, the Construction Operating System for residential builders. It handles daily diaries, photo logs, defects and safety checklists, and syncs live across the operating system so the office sees site activity as it’s recorded.

ViaSite is included in every plan. It’s one module of the operating system, not a paid add-on.

Supervisors and leading hands on the ground, rather than office staff. It’s designed to be fast on a phone so the daily record actually gets captured, rather than skipped because the software is awkward.

Yes. ViaSite runs on one data model with the rest of the operating system, so diaries, photos, defects and safety checks attach to the right job and appear in the office without a phone call or a weekly catch-up.

Yes. Diary entries are typed, and there is no dictation or voice capture in ViaSite. We would rather say that plainly than imply otherwise. What ViaSite does instead is make the entry short enough to finish standing at the fence: a type tag for what kind of day it was, a few lines of what happened, photos straight from the camera, and a visibility setting deciding whether the office, the trades or the client can read it. If you are out of signal it queues on the phone and sends when you reconnect, so the record still gets made in the time it takes to walk back to the ute.

No. There is no weather service behind VIABUILD, and nothing is filled in for you. Weather is marked on the daily log entry by the person who was there, who taps the morning and afternoon conditions and types the day’s high and low. The upside is that the record reflects what the site actually experienced, which is often not what a regional observation says. The trade-off is that the diary is only as complete as the person posting it, so if weather is going to matter on a job, the discipline is to mark it every day rather than only on the bad ones.

Common site jobs done in a single tap. You set each action up once in the office, naming the supplier it goes to and the message it sends, and a supervisor then fires it from site. The flagship is the Skip Bin Re-order: one tap and the contracted bin supplier for that site receives an order with the job, the site address, the date and any note already filled in, so there is no phone call and no number to look up. Every run is logged against the job, and an action fired out of signal queues on the phone and sends when it reconnects. To be precise about the limits, it sends the order to the supplier, it does not raise a purchase order, and it does not confirm the delivery back to you.

06 / Keep reading

Related features & guides

Put a site app on the fence that gets used.

Start with 7 days free, the full operating system, real data. Then $555/mo. ViaSite is one module of VIABUILD, included from day one.