Feature · Site safety

Safety that’s built in.
Not a second app and a second bill.

SWMS, toolbox talks, incident reports and site sign-in, one module of the operating system, not a bolt-on. Branded QR site signs let subbies and inspectors sign in straight from the fence, with the record attached to the job.

7 days free · then $555/mo · Month-to-month

01 / What it does

What this feature does

Site safety is one module of VIABUILD, the Construction Operating System for residential builders. It covers the compliance tasks that sit on a live site (SWMS, toolbox talks, incident reporting and site sign-in) on the same data model as the rest of the job, so there is no separate safety app to pay for and reconcile. The obligations themselves are covered in our references on WHS in residential construction and SWMS.

The standout is QR site sign-in: every project can have a branded VIABUILD site sign with a QR code on the fence. Visitors, subbies and inspectors scan it to sign in and reach the safety documents, so your sign-in record builds itself. Because it runs on one connected system, the same field sign-in sits alongside the daily diary and photo logs supervisors capture in ViaSite, entered once and shared everywhere.

Inductions run through the same sign-in, and they have their own three pages because inducting a contractor is a discipline in its own right. What the software should do is on contractor induction software, what the obligation actually is sits in site inductions, and the content to induct against is the site induction checklist. This page stays on the rest of site safety.

02 / Why it matters

Why builders need it

Two systems is two problems

A standalone safety app means another login, another bill, and safety data that lives away from the job it belongs to. On one operating system it lives with the job.

Paper sign-in doesn’t hold up

A clipboard at the gate gets ignored and lost. A QR sign-in builds a real, time-stamped record automatically.

SWMS go stale between jobs

A SWMS written for the last job and reused unread is documentation, not control. Held against the project it belongs to, it stays the document the work is actually being done under.

Incidents need a fast record

When something happens on site, you want the report captured then and there, not reconstructed days later.

Compliance is non-negotiable

SWMS and toolbox talks are part of doing business. Tools built into the operating system make keeping the documentation straightforward.

Your brand on every fence

A branded QR site sign doubles as professional signage, with your name on the hoarding, not a generic sticker.

03 / The VIABUILD way

How VIABUILD handles it

Compliance tools plus QR sign-in, on every site.

Run SWMS, toolbox talks and incident reports inside VIABUILD, attached to the project they relate to. Because safety is one module of the operating system and not a separate system, the documentation is where you’d look for it. Toolbox talks also line up with the work fronts on your construction schedule, so the talk that covers a risk happens before the trade that carries it turns up.

Mount a branded QR site sign on the fence and anyone arriving scans it to sign in and reach the safety documents. Sign-ins are captured in the field through ViaSite, your sign-in log builds itself, and the sign doubles as professional site signage. (Site signs are $285 each.) The same scan is where an uninducted arrival is picked up, which the induction pages cover in full.

  • SWMS and toolbox talks built in
  • Incident reporting captured on site
  • QR site sign-in from the fence
  • Branded site signs double as signage
  • Safety attached to the right project
  • One module of the operating system · included in every plan

04 / The workflow

How it runs, step by step

  1. 01

    Set up safety docs

    Add your SWMS and toolbox talk content against the project it applies to.

  2. 02

    Order a site sign

    Get a branded VIABUILD QR site sign ($285 each) for the fence.

  3. 03

    People scan in

    Subbies, visitors and inspectors scan the QR to sign in on arrival.

  4. 04

    Documents on the phone

    Whoever signed in reaches the SWMS and safety documents for that site from their phone.

  5. 05

    Log builds itself

    Sign-ins are time-stamped and recorded automatically, with no clipboard.

  6. 06

    Report incidents

    If something happens, capture the incident report on site, attached to the job.

05 / FAQ

Common questions.

SWMS, toolbox talks, incident reports and visitor and site sign-in, all one module of VIABUILD (the Construction Operating System for residential builders) and attached to the relevant project, rather than living in a separate safety app. Contractor inductions run off the same sign-in and are covered on the contractor induction software page.

Each project can have a branded VIABUILD site sign with a QR code mounted on the fence. Visitors, subbies and inspectors scan it to sign in and access the safety documents for that site, which builds a time-stamped sign-in record automatically.

Safety management is included in every plan. It’s one module of the operating system, not a paid bolt-on. The branded QR site signs are a physical product at $285 each.

Branded site signs are $285 each. They carry the QR code for sign-in and double as professional site signage with your brand on the fence.

06 / Keep reading

Related features & guides

Put safety where the job already is.

Start with 7 days free, the full operating system, real data. Then $555/mo. Safety is one module of VIABUILD, included in every plan from day one.