Migration · From Buildxact
Leave Buildxact without
losing the rates you built.
This is the switching guide. What to confirm with Buildxact before you cancel, what to bring into VIABUILD, and how to run both on a live job until you trust the new one.
01 / What this page is
The how, not the shortlist
If you are still deciding whether to leave, and what category of product should replace it, that work belongs on Buildxact alternatives. If you want the dimension-by-dimension pairing, that is VIABUILD vs Buildxact. This page starts after those two: you have decided to move, and you need the switch itself not to wreck a month of live jobs.
The general move, from any platform or from spreadsheets, is on migration. What follows is the Buildxact-shaped version of that work: confirm what you can take out, protect the history you will need later, bring rates and assemblies across, and run both systems on one real job until the numbers agree.
02 / What you are leaving
What Buildxact says it is
Buildxact describes itself, on its Australian site, as estimating and project management software for residential builders. The home page frames the product as total job management from first takeoff to final invoice, covering estimating, scheduling and job tracking. It also names takeoffs, quoting, supplier connection with material pricing, and an AI assistant it calls Blu, with a Recipe Assistant, Estimate Reviewer, Takeoff Assistant and Estimate Generator.
The Australian pricing page publishes three plans. Foundation is described for builders who need to estimate and bid. Pro is described for job management. Master is described as the full set. The feature chart on that page names digital takeoffs, estimate costings, purchase orders, change orders, schedules, selections, timesheets, actual costings, invoicing, accounting integrations, a client portal and an Onsite mobile app, among other items. Those are Buildxact’s words about Buildxact, read on 5 November 2026. Products change between releases. Confirm current capability with them, not with us.
None of that tells you whether the product still fits your business. It tells you what you are walking away from, so the move is a decision rather than a mood. The usual reason a builder leaves an estimating-led tool is not that takeoff stopped working. It is that the estimate then has to be re-typed into a budget, a purchase order, a claim and the ledger, and those four copies start to disagree.
03 / The process
How the switch runs
- 01
Ask Buildxact what you can take out
Do this in your own account, not from a comparison page. Ask what leaves, in what format, and for which records: suppliers, cost codes, catalogues, assemblies or recipes, templates, job history and documents. Run the export. A promised file that does not open is not an export.
- 02
Keep history reachable after you cancel
Warranty periods and disputes outlast a subscription. Agree how you will still open past quotes, claims, approvals and correspondence before you give notice. Read-only access, a local archive, or both. Do not leave this until the last invoice.
- 03
Decide the rule for jobs already on site
Finish live jobs in Buildxact and start new ones in VIABUILD. That is the least disruptive pattern. Moving a half-claimed job mid-flight is possible and is the option that creates two incomplete pictures. Pick the rule before anyone imports a line.
- 04
Tidy the rates before they move
The valuable thing in an estimating-led tool is usually the price book and the assemblies, sitting next to rates nobody has priced against in two years. Merge duplicate suppliers. Settle one unit per item. Retire the dead rows. Moving rot costs the same as moving live rates.
- 05
Bring cost codes, products and assemblies into VIABUILD
There is no one-click Buildxact importer. Cost codes come in from a CSV template. Price lists upload as CSV or Excel and match to products. A bulk product upload creates supplier contacts as it goes. Assemblies and estimate parameters have their own import. The work is mapping your old structure to the new one.
- 06
Connect Xero, then check the accounting seam
Link your Xero organisation and import contacts so clients and suppliers are not keyed twice. Once Xero is connected, check how approved bills and claims flow through. Confirm the current behaviour in your own file rather than taking a features page as the test.
- 07
Run one live job in both until the numbers agree
Not a sample job. One real job, priced, ordered and claimed in both systems, long enough to see a variation and a claim go through. When the numbers agree, Buildxact becomes the archive for finished work and VIABUILD becomes the system of record for new work.
04 / What actually moves
Rates travel. History usually stays.
The common mistake is treating the switch as a weekend of file moving. The rates you trust are usually the ones someone has been quietly maintaining by hand. They sit next to items nobody has used in two years. If you import both, you have paid to move the rot, and the new system inherits a price book nobody believes. Tidy first.
The second common mistake is moving a half-built job mid-claim. You then have two incomplete pictures and no one system you can show a client or a certifier. Finish the jobs that are already on site where they are. Start the next one in VIABUILD. That costs a period of running both, and it is cheaper than reconstructing a live claim.
We will not promise a specific Buildxact export. What leaves, and in what format, is a question for Buildxact and for your own account. What we can say about the landing side is already on migration: VIABUILD imports cost codes, price lists, products, assemblies and Xero contacts through tools built for each kind of data. There is no Buildxact importer. The mapping is the work.
05 / What lands
What VIABUILD does with what you bring
The estimate becomes the job, not a PDF you re-key.
In VIABUILD a quantity taken off once becomes the budget line, the purchase order, the committed cost and the progress claim, without being typed again. Oryn reads supplier invoices and codes them to the job, so the double keying into Xero and a cost sheet stops, and job costs are live rather than rebuilt at month end. Setup and training sit on implementation, on the data you have moved, not a blank account.
- Cost codes, so the chart of job costs is the same on day one
- Products and supplier pricing
- Assemblies and estimate parameters
- Contacts from Xero
- New jobs priced, ordered and claimed on one data model
06 / FAQ
Common questions.
Yes. Finish live jobs in Buildxact and start new ones in VIABUILD, and run one real job in both until the numbers agree. The old system stays available. There is no big-bang weekend where the office stops quoting.
Usually cost codes, suppliers, products and rates, and assemblies or recipes. Confirm with Buildxact what you can take out and in what format, then tidy before you import. Finished jobs are often better left as a read-only archive where they were run.
No. There is no Buildxact importer. Data comes through VIABUILD’s cost code, price list, product and assemblies imports. How that mapping work is split between you and us is on the migration page.
No. Keep access until you have a live job that reconciles in VIABUILD, and until you know how you will reach past quotes, claims and correspondence. Warranty and disputes outlast the subscription.
7 days free, then $555/month including GST. Start on a real job and run it beside Buildxact until you trust the numbers.
No. The category shortlist is on the Buildxact alternatives page. The head-to-head with VIABUILD is on the comparison page. This page is only the switch.
07 / Keep reading
Related
Start the switch on a real job.
7 days free, then $555/month including GST. Bring cost codes and a price list across, price a job you have already quoted, and keep Buildxact running beside it until the numbers agree.